TheTharDryPort, at Sanand has constructed PFT inside ICD with three railway sidings of LOA 710 meters and 1 Brake Van Siding for easy back and forth movements of power .All the three rail tracks are connected to IN MOTION WEIGH BRIDGE . Its strategic location is connecting to proposed DFC corridor through loop line, which HPCSL has constructed.
PFT operational since 2014 has reduced the TAT of rakes drastically thereby increasing the utilization of rakes and our throughput has increased from mere 1200 TEUS pm to 6500 TEUS per month